DOC273.52.00161Power connection box for sc analyzersMounting instruction07/2013, Edition 3A© HACH-LANGE GmbH, 2013. All rights reserved. Printed in Ge
10Figure 8 Circuit diagram (see inside of the lid) Clean the power connection socketWipe the outside of the housing with a damp cloth. Make sure that
112. Loosen the screws and remove the lid.3. Open the fuse holder (there are two fuses for each analyzer connection: one for the phase and another for
12Technical dataSubject to change. Replacement parts and accessories General informationPower supply 100–240 V~, + 10 %–15 %; 50/60 Hz; maximum 1000
13Warranty and liabilityThe manufacturer warrants that the product supplied is free of material and manufacturing defects and undertakes the obligatio
14Contact Information HACH CompanyWorld HeadquartersP.O. Box 389Loveland, Colorado80539-0389 U.S.A.Tel (800) 227-HACH(800) -227-4224(U.S.A. only)Fax (
3InstallationSafety informationRead the entire instruction sheet carefully before unpacking, setting up or operating this device. Pay attention to all
4The parts included in the scope of delivery for the power connection box are listed in Figure 1, page 4. Under some circumstances, not all supplied p
5AssemblyInstallation locationThe power connection box can be installed on a wall, a vertical pole or on horizontal rails.Note: Always make sure that
6Rail or pole assemblyNote: Make sure that the diameter of the rail or of the pole is between 35 and 55 mm.Note: Instructions on how to secure the hou
7Electrical connectionsThe power connection box is available with and without a pre-assembled power cable. If no pre-assembled power cable is provided
83. Unscrew the nut of the strain relief (component 5).4. Remove the cap of the strain relief (component 4).5. Strip off the insulation of all three c
9Figure 6 Cable connections Figure 7 Fuse holder 1 Cable guide 6 Power socket2 Sealing ringNote3 Cable gland Observe the output voltage at the power